the pool installers came last night at 6:00 pm to start the pool installation.
They first cleaned out the area where the pool is going, then started laying the concrete blocks that the wall supports will go.
They are supposed to be back sometime this morning.
I need to re-wire the electrical and once they are finished, I need to plumb the pool for the pump and filter. And redo part of the deck.
More later...
1 comment:
The first picture looks like the are having a picnic lunch. Paying them to sit around?
Hey, I like the eye candy you got over there. I think I should come over after all! yummy!
Post a Comment